亚洲av久无精品一区二区国产,99久久久久久久久久久久久久久,亚洲国产日韩不卡综合,亚洲精品综合色区二区

濟南蓬發(fā)建材有限公司為您提供臨邊護欄、木工防護欄、工程圍擋等相關信息發(fā)布和相關資訊,敬請關注!
新聞
聯(lián)系我們
咨詢電話
15866735826

聯(lián)系:張經理

手機: 15866735826

郵箱: 394441862@qq.com

網(wǎng)址:http://m.betterproxy.cn/

地址:山東省濟南市章丘圣井工業(yè)園

臨邊護欄防護作業(yè)操作的事項介紹

來源:http://m.betterproxy.cn/   發(fā)布時間:2024-03-13

在臨邊護欄作業(yè)施工時重要的是,大于一切,但盡管三令五申強調作業(yè),但還是有很多企業(yè)違反規(guī)定沒有按照政策去施工,導致了生產問題時有發(fā)生,給和社會造成很大損失。因此頒布臨邊洞口作業(yè)施工標準規(guī)范工地操作施工,這是繼91年標準后2016年新的基本規(guī)定。

When working on edge guardrails, it is important to prioritize safety. Safety is paramount. Despite the country's repeated emphasis on safe operations, many enterprises still violate regulations and fail to follow national policies, resulting in frequent safety production issues and causing significant losses to the country and society. Therefore, the country has issued construction standards for edge opening operations to regulate the safe operation and construction of construction sites, which is a new basic regulation in 2016 following the 91 year standard.

1 建筑施工中凡涉及臨邊與洞口作業(yè)、攀登與懸空作業(yè)、操作平臺、交叉作業(yè)及網(wǎng)搭設的,應在施工組織設計或施工方案中制定高處作業(yè)技術措施。

For construction involving edge and hole operations, climbing and suspended operations, operating platforms, cross operations, and safety net installation, safety technical measures for high-altitude operations should be formulated in the construction organization design or construction plan.

2 高處作業(yè)施工前,應按類別對防護設施進行檢查、驗收,驗收合格后方可進行作業(yè),并應做驗收記錄。驗收可分層或分階段進行。

20230315030529840.jpg

Before carrying out high-altitude operations, safety protection facilities should be inspected and accepted according to their categories. Only after passing the acceptance can operations be carried out, and acceptance records should be kept. Acceptance can be carried out in layers or stages.

3 高處作業(yè)施工前,應對作業(yè)人員進行技術交底,并應記錄。應對初次作業(yè)人員進行培訓。

Before carrying out high-altitude operations, safety technical briefing should be conducted to the workers and recorded. Training should be provided to first-time workers.

4 應根據(jù)要求將各類警示標志懸掛于施工現(xiàn)場各相應部位,夜間應設紅燈警示。高處作業(yè)施工前,應檢查高處作業(yè)的標志、工具、儀表、電氣設施和設備,確認其完好后,方可進行施工。

4. Various safety warning signs should be hung at the corresponding parts of the construction site according to requirements, and red lights should be set up for warning at night. Before carrying out high-altitude operations, safety signs, tools, instruments, electrical facilities, and equipment for high-altitude operations should be checked and confirmed to be in good condition before construction can proceed.

5 高處作業(yè)人員應根據(jù)作業(yè)的實際情況配備相應的高處作業(yè)防護用品,并應按規(guī)定正確佩戴和使用相應的防護用品、用具。

5. High altitude workers should be equipped with corresponding safety protection equipment according to the actual situation of the work, and should correctly wear and use the corresponding safety protection equipment and tools according to regulations.

6 對施工作業(yè)現(xiàn)場可能墜落的物料,應及時拆除或采取固定措施。高處作業(yè)所用的物料應堆放平穩(wěn),不得妨礙通行和裝卸。工具應隨手放入工具袋;作業(yè)中的走道、通道板和登高用具,應隨時清理干凈;拆卸下的物料及余料和廢料應及時清理運走,不得隨意放置或向下丟棄。傳遞物料時不得拋擲。

6 pairs of materials that may fall on the construction site should be promptly removed or fixed measures taken. The materials used for high-altitude operations should be stacked steadily and not obstruct passage and loading and unloading. Tools should be easily placed in a tool bag; The walkways, walkways, and high-altitude equipment used in homework should be cleaned at all times; The dismantled materials, surplus materials, and waste materials should be cleaned and transported away in a timely manner, and should not be arbitrarily placed or discarded downwards. Do not throw materials during transfer.

7 高處作業(yè)應按現(xiàn)行標準《建設工程施工現(xiàn)場消防技術規(guī)范》GB 50720的規(guī)定,采取防火措施。

7. Fire prevention measures should be taken for high-altitude operations in accordance with the current national standard GB 50720 Technical Code for Fire Safety at Construction Sites.

8 在雨、霜、霧、雪等天氣進行高處作業(yè)時,應采取防滑、防凍和防雷措施,并應及時作業(yè)面上的水、冰、雪、霜。當遇有6級及以上強風、濃霧、沙塵暴等惡劣氣候,不得進行露天攀登與懸空高處作業(yè)。雨雪天氣后,應對高處作業(yè)設施進行檢查,當發(fā)現(xiàn)有松動、變形、損壞或脫落等現(xiàn)象時,應立即修理完善,維修合格后方可使用。

When working at heights in rainy, frosty, foggy, snowy or other weather conditions, anti slip, anti freezing, and lightning protection measures should be taken, and water, ice, snow, and frost should be promptly removed from the work surface. When encountering severe weather conditions such as strong winds of level 6 or above, dense fog, and sandstorms, outdoor climbing and suspended high-altitude operations are not allowed. After rainy and snowy weather, safety facilities for high-altitude operations should be inspected. If any looseness, deformation, damage or detachment are found, they should be repaired and improved immediately. Only after passing the repair can they be used.

9 對需臨時拆除或變動的防護設施,應采取可靠措施,作業(yè)后應立即恢復。

Reliable measures should be taken for safety protection facilities that need to be temporarily dismantled or changed, and they should be restored immediately after operation.

本文由工地圍擋提供幫助,更多的相關內容請點擊http://m.betterproxy.cn希望本文能夠為您帶來幫助,感謝您的閱讀!

This article is provided by the construction site fence for assistance. For more related content, please click on http://m.betterproxy.cn I hope this article can be helpful to you. Thank you for reading!

国产麻豆视频一二三区| 日木乱偷人妻中文字幕在线| 色婷婷视频免费在线观看| 国产丝袜极品黑色高跟鞋| 欧美午夜色视频国产精品| 91亚洲人人在字幕国产| 国产又粗又猛又大爽又黄同志| 东京热男人的天堂社区| 午夜精品福利视频观看| 欧美成人免费一级特黄| 亚洲人午夜精品射精日韩| 日韩一区二区免费在线观看| 欧美日韩精品一区二区三区不卡| 色婷婷亚洲精品综合网| 国产精品香蕉一级免费| 欧美成人久久久免费播放| 久一视频这里只有精品| 亚洲综合天堂一二三区| 东京热男人的天堂久久综合| 超薄肉色丝袜脚一区二区| 国产在线成人免费高清观看av| 午夜福利在线观看免费| 国产成人精品资源在线观看| 日韩欧美一区二区黄色| 久久国产亚洲精品成人| 久热久热精品视频在线观看| 午夜精品国产一区在线观看| 成年人免费看国产视频| 午夜精品福利视频观看| 日韩成人免费性生活视频| 国产日韩欧美专区一区| 日韩中文字幕人妻精品| 亚洲天堂男人在线观看| 国产又色又爽又黄又免费| 日韩中文字幕视频在线高清版| 日韩成人中文字幕在线一区| 亚洲男人天堂网在线视频| 中文字幕佐山爱一区二区免费| 欧洲偷拍视频中文字幕| 亚洲一区二区精品免费| 免费黄片视频美女一区|